Forklift Safety Around Racking Systems: Complete Guide
August 23, 2025
Managing Inventory With Racking Systems: Complete Guide
August 24, 2025

Installation Tips For Industrial Racking Systems

Installation Tips For Industrial Racking Systems

Industrial racking installation decides whether a signed layout becomes a stable structure or a set of hidden faults waiting for the first forklift knock. This blog will walk you through the site method behind industrial racking in Singapore: anchoring, plumb and alignment, beam locking and the checks that close handover.

What industrial racking installation covers on site

Installation is the stage between steel arriving at the loading bay and the first pallet going up. It covers setting out, anchoring each base plate (the steel foot under an upright), plumbing the frames, fitting and locking beams, bracing, and proving the result before handover.

Two decisions sit outside this page. Scheduling is covered in our warehouse racking installation timeline. What must be fixed before steel is ordered belongs in the pre-installation checklist. Everything here assumes both are done and the stamped drawings are on site.

Checking the floor slab before anyone drills

Racking puts its whole load into the floor through a handful of small base plates, so the crew’s first job is to confirm the slab matches what the designer assumed.

Floor loading in JTC and strata industrial units

Most JTC and strata industrial units publish a floor loading in kN/m². Ground floors usually carry more than upper floors, and older flatted factories are often rated at 7.5 kN/m². That rating is a uniform figure. A loaded pallet rack concentrates its weight at each base plate, so the designer has to check point loads against the slab as well as the average.

JTC’s Space Submission Handbook sets hard limits for tenants. Shelves and racks are exempt from JTC plan consent only when they stay within 3.0 m high and 1.2 m wide, keep gross weight within 7.5 kN/m² or the design imposed load (whichever is lower), and leave a clear passageway of at least 1.2 m. Almost every pallet racking run goes past those numbers, so in JTC premises the works need plan consent before installation starts.

For exempt machinery and ceiling works, the same handbook caps anchor penetration at 40 mm into structural elements and excludes prestressed and hollow core slabs altogether. Compare the rack anchor’s specified embedment with the slab type before anyone picks up a drill. On a prestressed or hollow core slab, drilling waits until a Professional Engineer confirms positions and depth.

Heavy duty and cantilever runs load a slab differently from selective pallet racking, so check the anchor detail for the system being built. Our overview of industrial racking options for factories and warehouses sets out how the main types differ.

Setting out from the system datum

Setting out starts from a system datum, usually a building gridline agreed on the drawing. The crew snaps a chalk line along the front of every run and checks aisle widths before a single frame stands.

EN 15620 allows the rack frontage to vary by only ±10 mm from that datum at floor level. A line that is 15 mm out on day one is already a defect.

warehouse large logistics commerce

How uprights are anchored to the floor

Anchors hold the foot of each upright against truck impact and against the sideways forces a loaded frame develops. Published beam and frame capacities assume fixed base plates, so an unanchored run is working outside its rating.

Mechanical or chemical anchors

Two anchor families cover most jobs. Mechanical expansion anchors (wedge anchors and through bolts) grip the hole wall as the nut is tightened and suit sound slabs of normal thickness. Chemical anchors bond a threaded rod into the hole with resin, and they are the better choice on older, cracked or thinner slabs, or where a base plate lands near a slab edge or joint.

Diameter, embedment depth and edge distance come from the rack designer’s drawing and the anchor maker’s data, never from what happens to be in the van.

How many anchors, and how they go in

SEMA’s code of practice asks for a floor fixing through every footplate on single sided runs, and through all uprights once a frame’s height to depth ratio passes 6:1. Most base plates have two or more holes. One anchor per plate is normally enough, and the spare hole is there for when the drill hits rebar.

Holes are drilled to the specified depth and blown clean before the anchor goes in, since dust left in the hole weakens mechanical and resin anchors alike. Nuts are tightened with a calibrated torque wrench to the anchor maker’s value, and the figure is logged frame by frame. Over tightening a wedge anchor can crack the concrete around it, which leaves it as weak as a loose one.

Plumb and alignment tolerances under EN 15620

EN 15620 is the European standard for tolerances, deformations and clearances in pallet and cantilever racking. Installers in Singapore measure against it because the structural checks in EN 15512 assume a rack built within these limits.

For Class 400 racking (wide aisle and narrow aisle pallet racking served by counterbalance and reach trucks), these are the installation limits checked most often on site:

Measurement EN 15620 Class 400 limit
Out of plumb of each frame, cross aisle and down aisle ±H/350
Clear entry between two uprights at any beam level ±3 mm
Total run length over n bays ±3n mm
Rack frontage against the system datum ±10 mm
Misalignment of opposing uprights across a frame ±20 mm
Rack depth, single frame ±6 mm
Aisle width near floor level ±15 mm

H is the height from the top of the base plate to the top of the upright. On a 6,000 mm upright, H/350 gives 17 mm. Very narrow aisle racking (Class 300) is held tighter at H/500, which allows 20 mm on a 10,000 mm frame.

Measuring plumb in both directions

Cross aisle plumb is read across the frame face, and down aisle plumb along the run. A digital inclinometer or laser gives a quick reading, and a plumb bob hung from the top beam still works where bracing blocks the laser.

Read every frame, not a sample. In back to back runs, frames must never lean toward each other, because the lean narrows the flue space the fire engineer designed around.

Shimming uneven floors

Few Singapore warehouse slabs are level across a full run, so frames are brought into plumb with steel shims under the base plates. Use shims that match the base plate footprint so the load spreads across the whole plate, and keep each stack within the rack maker’s limit.

A stack that needs to go past that limit points to a floor problem, and grinding or a levelling compound is the proper fix. Where shims lift a base plate, check that the anchor still reaches its specified embedment in the concrete.

Fitting and locking the beams

Beams go in from the bottom level up, each end connector tapped fully down into the upright slots with a rubber mallet. A connector sitting one hook high can lift straight out when forks catch the beam.

Every beam then gets a locking device at both end connectors. The lock (a clip, pin or bolt, depending on the rack maker) stops the beam being lifted out of the upright by a fork or a pallet striking it from underneath. Fit locks as each beam goes in rather than in a sweep at the end of the shift, because the missing lock is always the one nobody rechecks. Our accessories guide covers beam locks and column protection in more detail.

Check every level against the beam schedule on the drawing. Frame capacity is calculated for the beam levels as drawn, so a beam fitted 75 mm higher than specified changes the clearance above the pallet below and the basis of the load rating.

Top beam height and sprinkler clearance

The top beam sets the highest load line in the building. The clearance between that load and the sprinkler deflectors comes from the sprinkler design under SS CP 52 and the SCDF Fire Code 2023, so the crew takes the figure from the fire protection drawings.

Measure from the top of a full height test load to the nearest deflector on every run before handover. If the gap is short, the fix is a lower top beam, not a sign asking operators to stack lower.

Seismic bracing and where BC3:2013 applies

Singapore sits in a low seismicity region. BCA’s BC3:2013 guidebook sets out how buildings here are designed for seismic actions to SS EN 1998-1, and it allows the lower ductility class for that reason.

BC3:2013 is written for building structures. For racking, it comes into play where the racking forms part of a structure submitted to BCA, such as a rack supported platform, or where the Professional Engineer adopts it for tall or heavily loaded runs. Whether a particular run needs seismic bracing is the PE’s decision, and the answer belongs on the drawing before the crew arrives.

Where seismic bracing is specified, it usually appears as plan bracing across the top, spine bracing along the back, heavier base plates or extra anchors. Install each item exactly as drawn. Leaving out a plan brace because it clashes with a light fitting breaks the calculation the design rests on.

Handover checks before the first pallet goes up

Handover is where the installer proves the rack matches the drawing. Each check leaves a record the occupier keeps:

  1. Plumb readings for every frame in both directions, within H/350 (or H/500 for very narrow aisle).
  2. An anchor torque log by frame, with any holes moved for rebar marked.
  3. Locks on both ends of every beam, and beam levels matching the schedule.
  4. Plan, spine and seismic bracing complete wherever specified, with bolts tight.
  5. Load notices on every run showing the safe load per beam level and per bay.
  6. Column guards and end of aisle barriers wherever trucks turn.
  7. Measured clearance to sprinkler deflectors, and aisle widths within ±15 mm.
  8. The as built drawing, load tables and the rack maker’s installation instructions.

Load notices matter more than they look. MOM’s WSH circular on the safe use of storage racks followed worker deaths in 2014 and 2015 where racks collapsed under loads they were not designed for, and it asks occupiers to display safe working loads prominently. EN 15635 puts the same duty on the user: the supplier provides the notice, and the occupier keeps it on display. Our guide to pallet racking load capacity explains how the beam and bay figures on that notice relate.

EN 15635 also expects the occupier to name a person responsible for storage equipment safety and to arrange an expert inspection at least every 12 months. A regular rack inspection in Singapore routine should start in the first week of operation, when the handover records are fresh and any installation fault is still the installer’s to fix.

Arranging an installation survey with NTL Storage

NTL Storage has supplied and installed racking systems in Singapore since 2012, from selective pallet runs to heavy duty and cantilever racking. Whoever installs yours, ask for the plumb readings, anchor torque log and as built drawing as part of handover, and compare quotes on that basis. If you are fitting out a JTC unit or replacing an older installation, book a site survey and we will check the slab, the consent route and the sprinkler clearances before any steel is ordered.

FAQs About Industrial racking installation

Does pallet racking have to be bolted to the floor in Singapore?

In practice, yes. Published beam and frame capacities assume fixed base plates, and SEMA guidance asks for a fixing through every footplate on single sided runs and through all uprights once frames pass a 6:1 height to depth ratio. Anchor size and depth come from the designer’s drawing, checked against the slab.

What is the plumb tolerance for pallet racking?

EN 15620 sets it. For wide aisle and narrow aisle pallet racking (Class 400), each frame may be out of plumb by no more than H/350 in either direction, where H is the upright height. That works out to 17 mm on a 6 m upright. Very narrow aisle racking is held to H/500.

Do I need JTC approval to install racking in a JTC factory?

Usually. JTC’s Space Submission Handbook exempts shelves and racks only up to 3.0 m high and 1.2 m wide, with gross weight within 7.5 kN/m² or the design imposed load, whichever is lower. Most pallet racking goes past these limits, so plan consent is needed before installation begins.

What do beam locking pins do?

A locking pin or clip holds the beam connector in the upright, so a fork or pallet striking the beam from below cannot lift it out of its slots. Every beam needs one at both ends, fitted as the beam goes in. Missing locks are a standard finding on rack inspection reports.

Is seismic bracing required for racking in Singapore?

It depends on the structure. BC3:2013, BCA’s guidebook for seismic design to SS EN 1998-1, is written for building structures, so it matters most for rack supported platforms and other structures submitted to BCA. For freestanding runs, the Professional Engineer decides and shows any seismic bracing on the drawing.